Legislation Details

File #: 26-0558    Version: 1
Type: information Status: In Committee
File created: 7/14/2026 In control: Site Plan Review Committee
Agenda date: 7/29/2026 Final action:
Title: Blackberry Hill Phase 3, 2501 Blackberry St SE, 26-4006
Attachments: 1. Attachment 1 - Preliminary Site Plan, 2. Attachment 2 - Vicinity Map, 3. Attachment 3 - Narrative Description, 4. Attachment 4 - Presubmission Details
Date Ver.Action ByActionResultAction DetailsMeeting DetailsMedia
No records to display.

Title

Blackberry Hill Phase 3, 2501 Blackberry St SE, 26-4006

 

Report

Project Information:

This project proposed to short plat lot 36 of Blackberry Hill Plat into 6 lots and 2 tracts for multifamily, five 4-plex and one duplex units.

Blackberry St Se will be extended through the site with a turnaround for Emergency Vehicles and Solid Waste trucks similar to what was constructed in Phase 1 using the access tracts with a wide concrete driveway approach.

Tract A will be a combination of SVPA and stormwater.

Tract B will be a shared parking lot for the short plat.

Utilities will be extended through the short plat. Sewer will be a combination of shallow gravity to serve Lots 2, 3 and 6, force main for the rest. Storm will consist of individual drywells on each lot and an infiltration pond for the road after being treated by a filter vault.

 

Applicant:

Chris Cramer, 8270 28th Court NE, Lacey WA 98516

 

Staff Contact:

Paula Smith, Associate Planner, 360.753.8596