Title
PUBLIC HEARING - Case: Woodbury Crossing Replat, 13-0094
Report
Applicant:
Lennar Northwest Inc., 12815 Canyon Rd E Suite F, Puyallup WA 98372
Representative:
Mr. Chris Ferko, Barghausen Consulting Engineers, Inc., 18215 72nd Ave S, Kent WA 98032
Type of Action Request:
Replat of Woodbury Crossing Phase 1 recorded plat map to:
* Convert Phase 1 Lots 67 and 74 to zero lot detached single family (from the existing two unit townhouse);
* Increase the Lot 74 width from 35.55 feet to 40 feet and decrease lot 73 width by 4.45 feet to 30.99 feet;
* Relocate shared wall line on lots 67 - 74; and
* Convert future Phase II Lots 122 & 123 from single family detached to attached single family (two unit townhouse).
Project Location:
South of the 4500 Block Mud Bay Road and west of Kaiser Road, along Greenwood Drive SW and 4th Avenue SW. Specifically, Woodbury Crossing Phase I platted Lots 67 - 74 (addressed as 4509, 4611, 4617, 4621, 4623, 4627 & 4629 Greenwood Drive SW); and Master Plan Approved Phase 2 Lots 122 & 123 (located at the northwest corner of Rosewood Drive and 4th Way SW).
Legal Description:
Lengthy legal description is on file with the city. A portion of Section 36 Township 18 Range 2W Quarter NE NW & SE NW SS090056OL LT 1 document 4112869.
Shoreline Environment:
None.
SEPA Determination(s):
A SEPA Mitigated Determination of Non-significance was issued for the Woodbury Crossing on November 25, 2005. No appeals were filed and the MDNS became final on December 14, 2005. (On file with the city) The replat is exempt.
Public Notification:
Public notification for this hearing was mailed to property owners within 300 feet, recognized neighborhood association(s), posted on the site, and published in The Olympian on or before October 3, 2013, in conformance with Olympia Municipal Code (OMC) 18.78.020.
Submitted by:
Steven Friddle, Principal Planner, 360.753.8591 on behalf of the Site Plan Review Committee
Legisl...
Click here for full text