File #: 18-0726    Version: 1
Type: resolution Status: Passed
File created: 7/26/2018 In control: City Council
Agenda date: 8/21/2018 Final action: 8/21/2018
Title: Approval of a Resolution Approving the Drinking Water State Revolving Fund (DWSRF) Loan for the Elliott Reservoir Seismic Upgrades
Attachments: 1. Resolution, 2. Contract
Title
Approval of a Resolution Approving the Drinking Water State Revolving Fund (DWSRF) Loan for the Elliott Reservoir Seismic Upgrades

Recommended Action
Committee Recommendation:
Not referred to a committee.

City Manager Recommendation:
Move to approve the resolution approving the Drinking Water State Revolving Fund Loan for the Elliott Reservoir Seismic Upgrades and authorize the City Manager to sign the loan contract in the amount of $1,515,000.

Report
Issue:
Whether to approve the Drinking Water State Revolving Fund Loan for the Elliott Reservoir Seismic Upgrades.

Staff Contact:
Tom Swartout, P.E., Water Resources Engineer, Public Works Water Resources, 360.753.8441

Presenter(s):
None - Consent Calendar Item.

Background and Analysis:
The Drinking Water State Revolving Fund (DWSRF) makes funds available to drinking water systems to pay for infrastructure improvements. The DWSRF program provides federal and state funds through low-interest construction loans to publicly owned (municipal) and privately owned drinking water systems. These loans help pay for capital improvements that protect public health and improve compliance with drinking water regulations.

The Department of Health (DOH) awarded the City a $1,515,000 DWSRF construction loan for a capital facilities project that will provide seismic retrofits to the Elliott Reservoir. The project will assess the current condition of the Elliott Reservoir, and design and construct retrofits to bring the reservoir up to standard seismic codes. This work will protect the City's drinking water supply by mitigating the risk of the collapse of the reservoir in an earthquake event.

Once Council has approved the loan, we will put out a Request for Proposals for an engineering design consultant. Design should start in fall of 2018, with construction beginning in summer of 2019.



Options:
1. Approve resolution authorizing the DWSRF Loan for the Elliott Reservoir Seismic Upgrades and authorize the City ...

Click here for full text